{"id":1227,"date":"2023-04-25T15:21:02","date_gmt":"2023-04-25T13:21:02","guid":{"rendered":"https:\/\/klimapaktfirbetriber.lu\/mesures\/photovoltaique-entreprise\/"},"modified":"2026-03-25T10:37:18","modified_gmt":"2026-03-25T09:37:18","slug":"installing-photovoltaic-panels-on-company-roofs","status":"publish","type":"mesures","link":"https:\/\/www.klimapaktfirbetriber.lu\/en\/measures\/installing-photovoltaic-panels-on-company-roofs\/","title":{"rendered":"Installing photovoltaic panels on company roofs"},"content":{"rendered":"\n<h2 class=\"wp-block-heading has-text-align-left\">Photovoltaics: an environmentally and financially interesting alternative for your company&#8217;s electricity production<\/h2>\n\n\n\n<p>A photovoltaic installation enables you to produce renewable electricity and to decouple part of your electricity costs from market price fluctuations. Beyond self-consumption, there are other support mechanisms that can represent an interesting economic model, such as the guaranteed feed-in tariff or the market premium resulting from a call for tenders. The installation can be financed from your own funds or by a third-party investor, who can also take care of its planning and completion.<\/p>\n\n\n\n<!--more-->\n\n\n\n<h3 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Definition of the requirements<\/h3>\n\n\n\n<h4 class=\"wp-block-heading\">Analysis of plant location and solar potential &#8211; solar cadastre<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/map.geoportail.lu\/theme\/energie?version=3&amp;zoom=11&amp;X=676621&amp;Y=6411791&amp;lang=en&amp;rotation=0&amp;layers=152-1818-1819-1813-1381&amp;opacities=1-1-1-1-1&amp;time=--------&amp;bgLayer=basemap_2015_global\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/map.geoportail.lu\/theme\/energie?version=3&amp;zoom=11&amp;X=676621&amp;Y=6411791&amp;lang=en&amp;rotation=0&amp;layers=152-1818-1819-1813-1381&amp;opacities=1-1-1-1-1&amp;time=--------&amp;bgLayer=basemap_2015_global\" rel=\"noreferrer noopener\">Self-assessment of solar potential<\/a><\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group has-light-green-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<h3 class=\"wp-block-heading\">To go further:<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Analysis of load curve and estimation of degree of self-consumption<\/strong><br>Request consumption data from the <a href=\"https:\/\/www.ilr.lu\/secteurs-activites\/energie\/electricite\/fourniture-gestionnaires-reseau\/gestionnaires-de-reseau\/gestionnaires\/\" target=\"_blank\" rel=\"noreferrer noopener\">grid operator<\/a> or <a href=\"https:\/\/web.ilr.lu\/FR\/Particuliers\/Electricite\/Informations-utiles\/Les-acteurs-du-marche\/Pages\/default.aspx\" target=\"_blank\" rel=\"noopener\">supplier<\/a> (possibility of requesting through the supplier&#8217;s online portal) and compare with the photovoltaic system&#8217;s forecast production to estimate the degree of self-consumption.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Project implementation by a project developer \/ third-party investor<\/strong><br>For installations of 100 kW or more, it is possible to commission a <a href=\"https:\/\/www.klima-agence.lu\/fr\/planificateurs-photovoltaique\" data-type=\"link\" data-id=\"https:\/\/www.klima-agence.lu\/fr\/planificateurs-photovoltaique\" target=\"_blank\" rel=\"noreferrer noopener\">photovoltaic project developer<\/a> who can take care of the development, financing, construction, operation and maintenance of the installation.<\/li>\n<\/ul>\n<\/div><\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n\n\n<h3 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Identify solution and check feasibility of photovoltaic panel installation project<\/h3>\n\n\n\n<h4 class=\"wp-block-heading\">General planning of the installation (depending on the scope of the project, in collaboration with a qualified craftsman or design office)<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Qualified craftsmen (<a href=\"https:\/\/www.fgt.lu\/fr\/nos-membres\/?selectCat=Electricien&amp;searchKeywords=\" target=\"_blank\" rel=\"noopener\">certified electrician<\/a>)<\/li>\n\n\n\n<li><a href=\"https:\/\/www.klima-agence.lu\/en\/business\/accompanying-you\/photovoltaics\/large-scale-photovoltaic-project-planners\" target=\"_blank\" rel=\"noopener\">List of large-scale photovoltaic project planners<\/a><\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\">Feasibility study of the solar panel installation project<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Technical and constructive feasibility (static calculations, roof condition, etc.): design<a href=\"https:\/\/www.oai.lu\/fr\/9\/topmenu\/annuaire-membres\/?idactivity=35456\" target=\"_blank\" rel=\"noopener\"> office<\/a><\/li>\n\n\n\n<li>Connection feasibility: <a href=\"https:\/\/web.ilr.lu\/FR\/Particuliers\/Electricite\/Informations-utiles\/Les-acteurs-du-marche\/Pages\/default.aspx\" target=\"_blank\" rel=\"noopener\">network operator<\/a><\/li>\n\n\n\n<li>Fire protection requirements: <a href=\"https:\/\/112.public.lu\/fr\/legislation\/prevention\/demandeavis.html\" data-type=\"link\" data-id=\"https:\/\/112.public.lu\/fr\/legislation\/prevention\/demandeavis.html\" target=\"_blank\" rel=\"noreferrer noopener\">CGDIS<\/a><\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\">Request for quotation<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Qualified craftsmen (<a href=\"https:\/\/www.fgt.lu\/fr\/nos-membres\/?selectCat=Electricien&amp;searchKeywords=\" target=\"_blank\" rel=\"noopener\">certified electrician<\/a>)<\/li>\n\n\n\n<li>Possibility of including plant maintenance in the offer<\/li>\n<\/ul>\n\n\n\n<h3 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Subsidy application<\/h3>\n\n\n\n<h4 class=\"wp-block-heading\">Government subsidies<\/h4>\n\n\n\n<p class=\"has-light-green-background-color has-background\"><strong>Please note: any application for government or non-government subsidies must comply with the &#8220;incentive effect&#8221;, subject to compliance with the subsidy conditions.<\/strong><br>In order to respect the &#8220;incentive effect&#8221;, no binding commitment (signing a quotation; paying a deposit) may be made BEFORE having received the agreement in principle from the State or the electricity and natural gas supplier following an application for subsidy.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><a href=\"https:\/\/guichet.public.lu\/en\/citoyens\/aides\/logement-construction\/klimabonus-2026\/aide-installations-techniques.html\" target=\"_blank\" rel=\"noreferrer noopener\">Klimabonus<\/a><\/h4>\n\n\n\n<p>The Klimabonus state subsidy scheme is available to both legal entities and individuals. However, pre-financing is not available to legal entities whose activities are subject to a business permit. These entities must follow the standard procedure and apply to the Environment Agency (AEV) after the work has been completed.<\/p>\n\n\n\n<p>The subsidy rate for a photovoltaic installation is calculated based on the power of the system, using the following formula:<\/p>\n\n\n\n<p class=\"has-text-align-center\"><strong>P<sub>PV<\/sub> * (1.155 &#8211; (1.155 \/ 35) * P<sub>PV<\/sub>) \u20ac<\/strong><\/p>\n\n\n\n<p>P<sub>PV<\/sub>: peak electrical power of the photovoltaic solar installation concerned, expressed in kilowatt-peak (kW<sub>p<\/sub>) and rounded to two decimal places.<\/p>\n\n\n\n<p>This scheme does not impose any limit on the peak power of the installation. However, a ceiling of \u20ac10,000 per installation applies for systems with a capacity of 15 kW<sub>p<\/sub> or more. The minimum eligible capacity is 2 kW<sub>p<\/sub>.<\/p>\n\n\n\n<p>A photovoltaic installation can be combined with a storage battery, which is also eligible for a subsidy. For further details, please refer to the measure \u201c<a href=\"https:\/\/www.klimapaktfirbetriber.lu\/en\/measures\/installation-of-a-battery-storage-system-in-your-company\/\">Installation of a battery storage system in your company<\/a>\u201d. Here you cand find more information on the <a href=\"https:\/\/www.klimapaktfirbetriber.lu\/wp-content\/uploads\/2026\/01\/Graphique-Klimabonus-PV-VF.pdf\">application procedure for financial assistance<\/a>.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>If you have any questions, please contact <a href=\"mailto:entreprises@klima-agence.lu\">Klima-Agence<\/a>.<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\">Call for tenders for operating subsidies for large-scale photovoltaic power plants<\/h4>\n\n\n\n<p>The operating subsidy allows, in principle, companies to enter into a market premium contract over a 15-year period, during which they will be remunerated based on the electricity produced and fed into the grid.<\/p>\n\n\n\n<p><strong>There are currently no open calls for tenders under the operating aid scheme.<\/strong><\/p>\n\n\n\n<p>An indicative multi-annual timetable now makes it possible to anticipate future opportunities.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th scope=\"col\"><\/th><th scope=\"col\">2026<\/th><th scope=\"col\">2027<\/th><th scope=\"col\">2028<\/th><\/tr><\/thead><tbody><tr><th scope=\"row\">Application period<\/th><td>1 July \u2013 30 October<\/td><td>1 July \u2013 29 October<\/td><td>3 July \u2013 31 October<\/td><\/tr><tr><th scope=\"row\">Volume for tender<\/th><td>40\u201350&nbsp;MW<\/td><td>40\u201350&nbsp;MW<\/td><td>40\u201350&nbsp;MW<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\">Application periods and volumes for tender for the years 2026, 2027 and 2028<\/figcaption><\/figure>\n\n\n\n<h4 class=\"wp-block-heading\"><a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/aides-environnement\/appel-projets-photovoltaique\/appel-photovoltaique-aides-investissements.html\" data-type=\"link\" data-id=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/aides-environnement\/appel-projets-photovoltaique\/appel-photovoltaique-aides-investissements.html\" target=\"_blank\" rel=\"noopener\">Call for tenders to support investment in photovoltaic installation projects >30kWp and \u2264200 kWp<\/a><\/h4>\n\n\n\n<p>As part of competitive tenders for photovoltaic installation projects, the State supports the establishment of photovoltaic power plants through investment aid. This subsidy is granted to encourage companies to produce their own energy.<\/p>\n\n\n\n<p>This new call for tenders launched by the Ministry of Economy is open from 16 February to 17 April 2026 and comprises three lots (see table below). For each lot, sub-lots dedicated to photovoltaic installations with storage devices are included. The maximum budget for this call for tenders is \u20ac3 million.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th rowspan=\"3\">Lot&nbsp;1:<\/th><th colspan=\"2\">Building rooftops; Industrial zone land<\/th><\/tr><tr><th>Sub-lot 1a: without storage<\/th><th>Sub-lot 1b: with storage<\/th><\/tr><tr><td>610&nbsp;\u20ac\/kWp<\/td><td>790&nbsp;\u20ac\/kWp<\/td><\/tr><tr><th rowspan=\"3\">Lot&nbsp;2:<\/th><th colspan=\"2\">\u201cInnovative\u201d (lightweight roof modules, wall-mounted modules)<\/th><\/tr><tr><th>Sub-lot 2a: without storage<\/th><th>Sub-lot 2b: with storage<\/th><\/tr><tr><td>845&nbsp;\u20ac\/kWp<\/td><td>1&nbsp;025&nbsp;\u20ac\/kWp<\/td><\/tr><tr><th rowspan=\"3\">Lot&nbsp;3:<\/th><th colspan=\"2\">Car park canopies<\/th><\/tr><tr><th>Sub-lot 3a: without storage<\/th><th>Sub-lot 3b: with storage<\/th><\/tr><tr><td>1&nbsp;100&nbsp;\u20ac\/kWp<\/td><td>1&nbsp;280&nbsp;\u20ac\/kWp<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><em>Table 1: Maximum aid amounts in \u20ac\/kWp<\/em><\/figcaption><\/figure>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Here is the link to the&nbsp;<a href=\"https:\/\/guichet.public.lu\/dam-assets\/catalogue-pdf\/aides-meco\/appel-projet-photovoltaique\/appel-projet-photovoltaique-cahier-charges\/appel-projet-photovoltaique-cahier-charges.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">specifications<\/a>&nbsp;in French<\/li>\n\n\n\n<li>If you have any questions, please contact&nbsp;<a href=\"mailto:entreprises@klima-agence.lu\">Klima-Agence<\/a><\/li>\n<\/ul>\n\n\n\n<p>An indicative multi-year calendar now makes it possible to anticipate future opportunities.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th class=\"has-text-align-center\" data-align=\"center\" scope=\"colgroup\" colspan=\"3\">\n          2026\n        <\/th><\/tr><tr><th class=\"has-text-align-center\" data-align=\"center\" scope=\"col\">Application period<\/th><th class=\"has-text-align-center\" data-align=\"center\" scope=\"col\">Power category<\/th><th class=\"has-text-align-center\" data-align=\"center\" scope=\"col\">Expected volume<\/th><\/tr><\/thead><tbody><tr><th class=\"has-text-align-center\" data-align=\"center\" scope=\"row\">16 February \u2013 17 April<\/th><td class=\"has-text-align-center\" data-align=\"center\">30 \u2013 200 kW<\/td><td class=\"has-text-align-center\" data-align=\"center\" rowspan=\"2\">30\u201340&nbsp;MW<\/td><\/tr><tr><th class=\"has-text-align-center\" data-align=\"center\" scope=\"row\">1 July \u2013 30 September<\/th><td class=\"has-text-align-center\" data-align=\"center\">All categories<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\">Application periods, power categories and expected volumes for the year 2026<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th class=\"has-text-align-center\" data-align=\"center\" scope=\"colgroup\" colspan=\"3\">\n          2027\n        <\/th><\/tr><tr><th class=\"has-text-align-center\" data-align=\"center\" scope=\"col\">Application period<\/th><th class=\"has-text-align-center\" data-align=\"center\" scope=\"col\">Power category<\/th><th class=\"has-text-align-center\" data-align=\"center\" scope=\"col\">Expected volume<\/th><\/tr><\/thead><tbody><tr><th class=\"has-text-align-center\" data-align=\"center\" scope=\"row\">4 January \u2013 31 March<\/th><td class=\"has-text-align-center\" data-align=\"center\">30 \u2013 200 kW<\/td><td class=\"has-text-align-center\" data-align=\"center\" rowspan=\"2\">30\u201340&nbsp;MW<\/td><\/tr><tr><th class=\"has-text-align-center\" data-align=\"center\" scope=\"row\">1 July \u2013 30 September<\/th><td class=\"has-text-align-center\" data-align=\"center\">All categories<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\">Application periods, power categories and expected volumes for the year 2027<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th class=\"has-text-align-center\" data-align=\"center\" scope=\"colgroup\" colspan=\"3\">\n          2028\n        <\/th><\/tr><tr><th class=\"has-text-align-center\" data-align=\"center\" scope=\"col\">Application period<\/th><th class=\"has-text-align-center\" data-align=\"center\" scope=\"col\">Power category<\/th><th class=\"has-text-align-center\" data-align=\"center\" scope=\"col\">Expected volume<\/th><\/tr><\/thead><tbody><tr><th class=\"has-text-align-center\" data-align=\"center\" scope=\"row\">3 January \u2013 31 March<\/th><td class=\"has-text-align-center\" data-align=\"center\">30 \u2013 200 kW<\/td><td class=\"has-text-align-center\" data-align=\"center\" rowspan=\"2\">30\u201340&nbsp;MW<\/td><\/tr><tr><th class=\"has-text-align-center\" data-align=\"center\" scope=\"row\">3 July \u2013 29 September<\/th><td class=\"has-text-align-center\" data-align=\"center\">All categories<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\">Application periods, power categories and expected volumes for the year 2028<\/figcaption><\/figure>\n\n\n\n<p class=\"has-light-green-background-color has-background\">N.B. Government subsidies and calls for projects cannot be combined for the same project.<\/p>\n\n\n<h4><a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/fiscalite\/bonification-impot-investissement\/bonification-transition-ecologique-energetique.html\" target=\"_blank\" rel=\"noopener\">Tax relief for investment in an ecological and energy transition project<\/a><\/h4>\n<p>The tax relief is calculated based on the investments and operating expenses incurred as part of an ecological and energy transition project.<br \/>\nThe tax relief rate is set at 18% and is applied directly to the amount of tax due.<br \/>\nThis deduction can be combined with standard state subsidies.<\/p>\n<p>For the project to be eligible, it must meet at least one of the following objectives:<\/p>\n<ul>\n<li>Improve the energy efficiency of a production process<\/li>\n<li>Improve the material efficiency of a production process<\/li>\n<li>Decarbonise a production process<\/li>\n<li>Reduce air pollution at the production site (excluding CO2 emissions)<\/li>\n<li>Produce or store renewable energy for self-consumption<\/li>\n<li>Promote the extended use of products through reuse<\/li>\n<\/ul>\n<p>For certain objectives, minimum thresholds must be met.<br \/>\nTo verify your eligibility and ensure that these thresholds are satisfied, it is recommended that the impact of the measure on one of the above conditions be certified by an expert or a design office.<\/p>\n<p>Further details and conditions: <a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/fiscalite\/bonification-impot-investissement\/bonification-transition-ecologique-energetique.html\" target=\"_blank\" rel=\"noopener\">Guichet.lu<\/a><br \/>\nFor questions: <a href=\"mailto:bonification@eco.etat.lu\">Ministry of Economy \u2013 Bonus<\/a><\/p>\n<div class=\"wp-block-group has-light-green-background-color has-background\">\n<div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">This type of project may be eligible for tax relief, subject to compliance with the criteria set out in Article 152bis L.I.R.<\/div>\n<\/div>\n\n\n\n\n<h3 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Applying for permits<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Municipal permits depending on the municipality where the project is located.<\/li>\n\n\n\n<li>Permit and conditions for the installation of <a href=\"https:\/\/www.ilr.lu\/secteurs-activites\/energie\/electricite\/fourniture-gestionnaires-reseau\/gestionnaires-de-reseau\/gestionnaires\/\" target=\"_blank\" rel=\"noreferrer noopener\">the grid operator<\/a>.<\/li>\n\n\n\n<li><a href=\"https:\/\/guichet.public.lu\/en\/citoyens\/logement\/urbanisme-environnement\/protection-nature\/autorisation-protection-nature.html\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/guichet.public.lu\/en\/citoyens\/logement\/urbanisme-environnement\/protection-nature\/autorisation-protection-nature.html\" rel=\"noreferrer noopener\">&#8220;Nature protection&#8221; permit<\/a> if the facility is located in a protected area.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>After the installation of photovoltaic panels<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>In the case of self-consumption: submitting the application for self-consumption to <\/strong><a href=\"https:\/\/www.ilr.lu\/secteurs-activites\/energie\/electricite\/fourniture-gestionnaires-reseau\/gestionnaires-de-reseau\/gestionnaires\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>the grid operator<\/strong><\/a>\n<ul class=\"wp-block-list\">\n<li>For the surplus electricity to be injected: sign an electricity buy-back contract at the market price with a <a href=\"https:\/\/www.ilr.lu\/secteurs-activites\/energie\/electricite\/fourniture-gestionnaires-reseau\/fourniture\/fournisseurs\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.ilr.lu\/secteurs-activites\/energie\/electricite\/fourniture-gestionnaires-reseau\/fourniture\/fournisseurs\/\" rel=\"noreferrer noopener\">supplier<\/a><\/li>\n\n\n\n<li>If participating in a call for tenders with investment aid: submit the request for payment of the aid via the tool on <a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/aides-environnement\/paiement-aides\/demande-paiement-aides-etatiques.html\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/aides-environnement\/paiement-aides\/demande-paiement-aides-etatiques.html\" rel=\"noreferrer noopener\">MyGuichet.lu<\/a>.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Apply for remuneration for the electricity produced by the photovoltaic system, depending on the specific situation:<\/strong>\n<ul class=\"wp-block-list\">\n<li>Guaranteed feed-in tariff under the Klimabonus subsidy scheme (&lt; 30 kWp)  with <a href=\"https:\/\/www.ilr.lu\/secteurs-activites\/energie\/electricite\/fourniture-gestionnaires-reseau\/gestionnaires-de-reseau\/gestionnaires\/\" target=\"_blank\" rel=\"noreferrer noopener\">the grid operator<\/a><\/li>\n\n\n\n<li>Feed-in tariff without investment aid for installations &gt;30kWp to &lt; 400 kWp with cooperative with <a href=\"https:\/\/www.ilr.lu\/secteurs-activites\/energie\/electricite\/fourniture-gestionnaires-reseau\/gestionnaires-de-reseau\/gestionnaires\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.ilr.lu\/secteurs-activites\/energie\/electricite\/fourniture-gestionnaires-reseau\/gestionnaires-de-reseau\/gestionnaires\/\" rel=\"noreferrer noopener\">the grid operator<\/a>.<\/li>\n\n\n\n<li>Market premium with or without a call for tenders for photovoltaic installations from 400 kWp to 10 MWp with the grid operator and conclusion of a contract for the direct sale of the electricity with an agent who is normally <a href=\"https:\/\/www.ilr.lu\/secteurs-activites\/energie\/electricite\/fourniture-gestionnaires-reseau\/fourniture\/fournisseurs\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.ilr.lu\/secteurs-activites\/energie\/electricite\/fourniture-gestionnaires-reseau\/fourniture\/fournisseurs\/\" rel=\"noreferrer noopener\">a supplier<\/a>.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<ul class=\"wp-block-list\">\n<li><strong>For systems &lt; 30 kWp , with the <\/strong><a href=\"https:\/\/guichet.public.lu\/en\/citoyens\/aides\/logement-construction.html\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Klimabonus subsidy<\/strong><\/a>\n<ul class=\"wp-block-list\">\n<li>The subsidy must be applied for after the installation has been completed, unlike other subsidies, where applications for subsidies must be made in advance of the commitment to carry out the project via MyGuichet.<\/li>\n\n\n\n<li>For further information: <a href=\"mailto:entreprises@klima-agence.lu\">Klima-Agence<\/a><strong><\/strong><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Scheduled maintenance of the installation<\/strong><\/li>\n<\/ul>\n","protected":false},"featured_media":639,"parent":0,"template":"","secteur":[129,138,74,123,67,76,132,77,68,69,62,72,71,73],"thematique":[78],"application":[126],"class_list":["post-1227","mesures","type-mesures","status-publish","has-post-thumbnail","hentry","secteur-boulanger-en","secteur-grocery-shop","secteur-administration","secteur-butcher-craft-industry","secteur-horeca-en","secteur-agriculture-viticulture","secteur-carpentry","secteur-aid-and-care-sector","secteur-construction-en","secteur-commerce-en","secteur-craft-industry","secteur-workshop","secteur-manufacturing","secteur-transport","thematique-energie-en","application-electricity"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures\/1227","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures"}],"about":[{"href":"https:\/\/www.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/types\/mesures"}],"version-history":[{"count":54,"href":"https:\/\/www.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures\/1227\/revisions"}],"predecessor-version":[{"id":2859603,"href":"https:\/\/www.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures\/1227\/revisions\/2859603"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/media\/639"}],"wp:attachment":[{"href":"https:\/\/www.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/media?parent=1227"}],"wp:term":[{"taxonomy":"secteur","embeddable":true,"href":"https:\/\/www.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/secteur?post=1227"},{"taxonomy":"thematique","embeddable":true,"href":"https:\/\/www.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/thematique?post=1227"},{"taxonomy":"application","embeddable":true,"href":"https:\/\/www.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/application?post=1227"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}