{"id":1508,"date":"2023-06-06T15:04:32","date_gmt":"2023-06-06T13:04:32","guid":{"rendered":"https:\/\/klimapaktfirbetriber.lu\/mesures\/optimisation-unite-chaleur-entreprise\/"},"modified":"2026-03-19T14:36:48","modified_gmt":"2026-03-19T13:36:48","slug":"optimization-of-existing-in-house-heat-production-unit","status":"publish","type":"mesures","link":"https:\/\/www.klimapaktfirbetriber.lu\/en\/measures\/optimization-of-existing-in-house-heat-production-unit\/","title":{"rendered":"Optimisation of existing in-house heat production unit"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Ensuring efficient heating system performance in the workplace<\/h2>\n\n\n\n<p>The production of heat for premises and production processes represents a major cost factor. To reduce heating costs, This is why it is essential to ensure that the heating system operates correctly and is as economical as possible. This also includes all peripheral installations, heat production and distribution.<\/p>\n\n\n\n<!--more-->\n\n\n\n<h3 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Definition of the company&#8217;s heating requirements<\/h3>\n\n\n\n<h4 class=\"wp-block-heading\">Heating system inspection<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Determination of the different parameters of the current installation, for example: age, general condition, temperature level, consumption and associated costs, etc.<\/li>\n\n\n\n<li>Energy evaluation of the heating system through the &#8220;<a href=\"https:\/\/environnement.public.lu\/fr\/loft\/air\/Installations-registres\/installations-combustion\/Heizungscheck.html\" target=\"_blank\" rel=\"noreferrer noopener\">Heizungscheck<\/a>&#8221; inspection process by a qualified professional (<a href=\"https:\/\/www.fgt.lu\/fr\/nos-membres\/?selectCat=Installateur%2BChauffage%2BSanitaire-Frigoriste-Ventilation&amp;searchKeywords=\" target=\"_blank\" rel=\"noopener\">heating engineer<\/a>)<\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group has-light-green-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p><strong>Taking your heating installation project one step further<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Heat consumption analysis<br>Track changes in heat consumption based on the latest energy bills, or meter data where applicable.<\/li>\n\n\n\n<li>Cross-referencing consumption data with heat production indicators<\/li>\n\n\n\n<li>Checking for leaks in the network<\/li>\n<\/ul>\n<\/div><\/div>\n<\/div><\/div>\n\n\n\n<h3 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Implement measures to optimize the heating system<\/h3>\n\n\n\n<h4 class=\"wp-block-heading\">For heat production<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Periodic maintenance and inspection of heat production units<\/li>\n\n\n\n<li>Optimisation of system operating periods according to need, e.g. night-time reduction, summer mode, etc. =&gt; Additional information developed by SuisseEnergie &#8220;<a href=\"https:\/\/pubdb.bfe.admin.ch\/en\/publication\/download\/9975\" target=\"_blank\" rel=\"noreferrer noopener\">Reduce the flow temperature outside of usage periods<\/a>&#8221; and &#8220;<a href=\"https:\/\/pubdb.bfe.admin.ch\/en\/publication\/download\/9976\" target=\"_blank\" rel=\"noreferrer noopener\">Give your heating a summer break<\/a>&#8220;<\/li>\n\n\n\n<li>Checking the heating curve =&gt; Further information from SuisseEnergie &#8220;<a href=\"https:\/\/pubdb.bfe.admin.ch\/en\/publication\/download\/9982\" target=\"_blank\" rel=\"noopener\">Set the heating curve correctly<\/a>&#8220;<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\">For heat distribution<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Circulation pump flow and return temperature control. Adaptation considering shutdown periods. =&gt; Further information from SuisseEnergie on &#8220;<a href=\"https:\/\/pubdb.bfe.admin.ch\/en\/publication\/download\/9974\" target=\"_blank\" rel=\"noopener\">Reduce the circulating pump&#8217;s flow rate<\/a>&#8221;&nbsp;<\/li>\n\n\n\n<li>Replacement of fixed-flow circulation pumps with energy-efficient, variable-flow pumps<\/li>\n\n\n\n<li>Inspect and, if necessary, insulate the system&#8217;s various thermal components (pipes, valves, pumps, etc.)\n<ul class=\"wp-block-list\">\n<li>Rule of thumb: cover pipes with an insulation thickness at least equal to the inside diameter, ideally twice the pipe diameter<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Hydraulic balancing<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\">For heat consumption<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Use of room temperature control devices, e.g. smart thermostats. Additional information developed by SuisseEnergie &#8220;<a href=\"https:\/\/pubdb.bfe.admin.ch\/en\/publication\/download\/9979\" target=\"_blank\" rel=\"noreferrer noopener\">Set thermostat valves correctly before the heating season<\/a>&#8221; and &#8220;<a href=\"https:\/\/pubdb.bfe.admin.ch\/en\/publication\/download\/9980\" target=\"_blank\" rel=\"noreferrer noopener\">Protect thermostat valves and limit the temperature<\/a>&#8220;.<\/li>\n\n\n\n<li>Reduce or switch off heating in unused areas, e.g. corridors, staircases, meeting rooms, plant rooms.<\/li>\n\n\n\n<li>Regularly bleeding radiators. Further information developed by SuisseEnergie &#8220;<a href=\"https:\/\/pubdb.bfe.admin.ch\/en\/publication\/download\/9981\" target=\"_blank\" rel=\"noreferrer noopener\">Vent radiators in autumn<\/a>&#8220;.&nbsp;<\/li>\n\n\n\n<li>Reduce the setpoint temperature in accordance with the minimum temperature recommendations in the ITM specification &#8220;Ventilation and air-conditioning systems&#8221;. <a href=\"https:\/\/itm.public.lu\/dam-assets\/fr\/securite-sante\/conditions-types\/itm-cl-1100-2000\/ITM-SST-1814-1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">ITM-SST-1814-1.pdf<\/a><\/li>\n\n\n\n<li>Appropriate use of heating in the production halls, using air heaters, infrared heaters, etc. only when necessary.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"type-numerotation\"><span class=\"type-numerotation-span visually-hidden\"><\/span>Subsidy application<\/h3>\n\n\n\n<h4 class=\"wp-block-heading\">Government subsidies<\/h4>\n\n\n\n<div class=\"wp-block-group has-light-green-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p><strong>Please note: any application for government or non-government subsidies must comply with the &#8220;incentive effect&#8221;, subject to compliance with the subsidy conditions.<\/strong><\/p>\n<\/div><\/div>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/regime-fit-4\/fit-4-sustainability.html\" data-type=\"link\" data-id=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/regime-fit-4\/fit-4-sustainability.html\" target=\"_blank\" rel=\"noopener\"><strong>Fit 4 Sustainability programme<\/strong><\/a><br><br>The Fit 4 Sustainability programme provides co-financing for environmental audits and action plans on one or more topics selected by the company (energy, GHG, waste, water, etc.).<br><br><strong>Aid of up to 60%, 70% and 80%<\/strong>, depending on the size of the company, for the fees associated with carrying out an environmental study (energy audit and\/or carbon footprint assessment) and a detailed, costed action plan to reduce its consumption\/GHG emissions (medium- and long-term investments, ROI, etc.) \u2013 open to SMEs and large companies (except those that must carry out studies required by the environmental authorities, including mandatory energy audits)<br>\n<ul class=\"wp-block-list\">\n<li>For questions: <a href=\"mailto:fit4sustainability@luxinnovation.lu\" data-type=\"mailto\" data-id=\"mailto:fit4sustainability@luxinnovation.lu\">Luxinnovation<\/a><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/financement-aides\/regime-sme-packages\/soutien-pme\/sme-packages-sustainability.html\" data-type=\"URL\" data-id=\"https:\/\/guichet.public.lu\/fr\/entreprises\/financement-aides\/regime-sme-packages\/sme-packages-sustainability.html\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>SME Packages &#8211; Sustainability<\/strong><\/a>\n<ul class=\"wp-block-list\">\n<li>Financial Aid for small and medium-sized enterprises covering up to 70% of eligible costs for the implementation of a project aimed at reducing the environmental impact. The eligible project budget must be in a range from 3.000 \u20ac to 25.000 \u20ac excl. VAT.<\/li>\n\n\n\n<li>For more information:\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/services.cdm.lu\/gestion-entreprise\/digitalisation\/sme-packages\" target=\"_blank\" rel=\"noreferrer noopener\">Chambre des M\u00e9tiers<\/a> for craft companies<\/li>\n\n\n\n<li><a href=\"mailto:sustainability@cc.lu\" data-type=\"mailto\" data-id=\"mailto:sustainability@cc.lu\" target=\"_blank\" rel=\"noreferrer noopener\">Chamber of Commerce<\/a> for businesses in the non-craft sectors<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<p class=\"has-light-green-background-color has-background\"><strong>N.B.: State subsidy cannot be combined for the same project.<\/strong><\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Application for subsidies from electricity and natural gas suppliers<\/h4>\n\n\n\n<p>As of 2015, natural gas and electricity suppliers are obliged under the Commitment Mechanism to generate energy savings among their consumers. Since then, energy suppliers have been offering monitoring and advisory services as well as subsidy programmes for consumers to implement energy efficiency measures.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/www.enoprimes.lu\/fr\/entreprises\/\" target=\"_blank\" rel=\"noreferrer noopener\">Enoprimes<\/a> Enovos + SUDenergie<\/li>\n\n\n\n<li><a href=\"https:\/\/sudenergie.lu\/en\/service\/save-energy\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">SUDenergie<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.sudstroum.lu\/en\/customer-services\/advice-financial-assistance\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.sudstroum.lu\/en\/customer-services\/advice-financial-assistance\/\" rel=\"noreferrer noopener\">Sudstroum<\/a><\/li>\n<\/ul>\n\n\n\n<p class=\"has-light-green-background-color has-background\"><strong>N.B.: Subsidies from suppliers can be combined with state subsidies for the same project.<\/strong><\/p>\n\n\n<h4><a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/fiscalite\/bonification-impot-investissement\/bonification-transition-ecologique-energetique.html\" target=\"_blank\" rel=\"noopener\">Tax relief for investment in an ecological and energy transition project<\/a><\/h4>\n<p>The tax relief is calculated based on the investments and operating expenses incurred as part of an ecological and energy transition project.<br \/>\nThe tax relief rate is set at 18% and is applied directly to the amount of tax due.<br \/>\nThis deduction can be combined with standard state subsidies.<\/p>\n<p>For the project to be eligible, it must meet at least one of the following objectives:<\/p>\n<ul>\n<li>Improve the energy efficiency of a production process<\/li>\n<li>Improve the material efficiency of a production process<\/li>\n<li>Decarbonise a production process<\/li>\n<li>Reduce air pollution at the production site (excluding CO2 emissions)<\/li>\n<li>Produce or store renewable energy for self-consumption<\/li>\n<li>Promote the extended use of products through reuse<\/li>\n<\/ul>\n<p>For certain objectives, minimum thresholds must be met.<br \/>\nTo verify your eligibility and ensure that these thresholds are satisfied, it is recommended that the impact of the measure on one of the above conditions be certified by an expert or a design office.<\/p>\n<p>Further details and conditions: <a href=\"https:\/\/guichet.public.lu\/en\/entreprises\/fiscalite\/bonification-impot-investissement\/bonification-transition-ecologique-energetique.html\" target=\"_blank\" rel=\"noopener\">Guichet.lu<\/a><br \/>\nFor questions: <a href=\"mailto:bonification@eco.etat.lu\">Ministry of Economy \u2013 Bonus<\/a><\/p>\n<div class=\"wp-block-group has-light-green-background-color has-background\">\n<div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">This type of project may be eligible, provided that the implemented project relates to the company\u2019s main economic activity, the eligibility thresholds are met, and that all other criteria set out in Article 152bis L.I.R. are complied with.<\/div>\n<\/div>\n\n","protected":false},"featured_media":756,"parent":0,"template":"","secteur":[138,74,129,67,76,123,77,132,68,69,62,72,71,73],"thematique":[78],"application":[104],"class_list":["post-1508","mesures","type-mesures","status-publish","has-post-thumbnail","hentry","secteur-grocery-shop","secteur-administration","secteur-boulanger-en","secteur-horeca-en","secteur-agriculture-viticulture","secteur-butcher-craft-industry","secteur-aid-and-care-sector","secteur-carpentry","secteur-construction-en","secteur-commerce-en","secteur-craft-industry","secteur-workshop","secteur-manufacturing","secteur-transport","thematique-energie-en","application-heating"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures\/1508","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures"}],"about":[{"href":"https:\/\/www.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/types\/mesures"}],"version-history":[{"count":27,"href":"https:\/\/www.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures\/1508\/revisions"}],"predecessor-version":[{"id":2826743,"href":"https:\/\/www.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/mesures\/1508\/revisions\/2826743"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/media\/756"}],"wp:attachment":[{"href":"https:\/\/www.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/media?parent=1508"}],"wp:term":[{"taxonomy":"secteur","embeddable":true,"href":"https:\/\/www.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/secteur?post=1508"},{"taxonomy":"thematique","embeddable":true,"href":"https:\/\/www.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/thematique?post=1508"},{"taxonomy":"application","embeddable":true,"href":"https:\/\/www.klimapaktfirbetriber.lu\/en\/wp-json\/wp\/v2\/application?post=1508"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}