Electric mobility, a key element in decarbonising your business

Electric cars are part of the solution to successfully decarbonising your company’s vehicle fleet. Filling up thermal cars with fuel from service stations is only partly applicable to this type of vehicle. It is essential to set up a suitable charging infrastructure.

Definition of the company’s mobility requirements

Analysis of requirements

Identifying the solution and checking the feasibility of the charging infrastructure project

  • If necessary, find an investor for the project

Verification of project feasibility in advance

Subsidy application

Notice: Incentive effect needs to be respected for all requests for subsidies (state or otherwise)

In order to respect the “incentive effect”, no binding commitment (signing a quotation; paying a deposit) can be made BEFORE having received the agreement in principle from the State or the electricity and natural gas supplier following a request for assistance.

Government subsidies

  • Subsidy for charging infrastructures supported by SMEs
  • Subsidy for charging infrastructures following a call for tenders (specifications)
  • Contact points for applications for grants for charging infrastructures:

Implementation of the project to install charging infrastructure for electric vehicles

  • Submitting an installation request to the network operator
    Application required for any installation of a charging point with a power rating greater than or equal to 7 kW (10A) three-phase or greater than 4.6 kW single-phase (20A).
  • Carry out the work in accordance with technical requirements and standards
  • Compliance check by the network operator
    The company responsible for the work notifies the network operator that the work has been completed.

Implementation aid

Contact us

I would like more information on:

  • Fit 4 Sustainability
  • Government subsidies
  • Support
  • Identifying partners

I would like more information on:

  • Klimabonus subsidies or photovoltaic and electromobility subsidy programmes
  • A technical aspect of the measure
  • A specific tool
  • A technical aspect of the site (404 link, etc.)

Contact Klima-Agence